Call service from RedConnect
ruen

Cheap Russian log home kits prices | Skill quality of logbuilding

the price of a chopped house depends on the volume of cedar logs and technology of cutting

Price cedar Log homes in our Work yard in Siberia (FCA)

We would like to immediately draw your attention to the fact that we, in the company of Bear Log, keep prices on log houses at a market average with consistently high quality of work! We can afford to keep prices below many "branded" companies operating in this market, thanks to the benefits that you can find out on the page "Why is it worth ordering the construction of a cedar house in the company of Bear Log?"

Estimate the price of a log house based on the area of ​​the house - it is impossible!

It's like asking a car dealer: "How much will a car with an 1,8 l engine?"

The price consists of several very important components that determine the cost of a log, such as:
1. The amount of bruven used, which depends on the following factors:
  • the number of walls and partitions in the house;
  • height of chopped walls;
  • the presence of chopped gables;
  • diameter of the log.

2. The qualities and properties of the log

  • availability of lengthy logs, more than 6-meters;
  • the presence of pronounced butt issues on skates, slopes and pillars.

3. Felling technology

4. Log processing degrees
5. The cost of delivery of the log house elements to your foundations.
  • It depends on the volume of the log in the house and the price for one flight of the carrier company.
Only after designing, discussing the TZ with the Customer and taking into account the above factors can the price of a log house be said.
The cost of a standard felling of a cedar log built on your foundations, depending on the technology of felling, will be approximately:

Russian felling

Canadian wheelhouse

Diamond house

Post and beam

Norwegian castle

25 000

rub / m3

320 EU / m3

26 000

rub / m3

340 EU / m3

27 000

rub / m3

340 EU / m3

30 000

rub / m3

370 EU / m3

30 000

rub / m3

370 EU / m3

or 37

Labour and materials included in the log house price

  • debarked by eder or braid;
  • antiseptic tips and notches during crafting
  • planed logs ridges and purlings the level of the roof slope;
  • design of doors and windows openings;
  • marking, disassembling, loading of the elements of the kits in trucks;
  • assembly of a log home kit on your foundations.

Labour and materials not included in the log house price

  • crane rental for unloading and installation of the log house on the foundations of the customer 500 Eu / m1000;
  • mezhventsovy heater Flax, jute, moss, sheep wool, halofiber or other.

Terms of payment for felling, delivery and assembly of the log house on your foundations

As a rule, we break all the work into the 3 phase,

  1. Felling log in Siberia
  2. Log carriage
  3. Building a log house on your foundations

You, watching the progress of work, pay them in stages.

Felling log in Siberia Log carriage Building a log house on foundations

50%

advance payment for the preparation of logs;

25%

when laying the first crown;

25%

at the end of the felling.

On the conditions and at the actual prices of the Carrier at the time when the log cabin is ready for shipment.

Payment is usually made for each car upon arrival of the car to the foundation.

50%

advance payment before starting installation work;

50%

at the end of the installation of the log house.

Custom log home prices.

Large diameter - for us it is a cedar log from 50 cm or more To form a log house price, you need to understand the total volume of the log in the log house, as well as the cutting technology and requirements for log processing by the Customer.

  • Cedar log house with 50 cm or more 360 EU/m3
To find out more precisely how the price of a cedar house is formed, click on the request form, and in real time, without waiting for a response from us, you will learn the order of prices for house or bathhouse cutting.